• Report by:

    Ann Davie, Chief Executive

  • TN Number:

    050-26

  • Subject:

    EDC 3 years Carriageway and Footway Resurfacing Programme

  • Responsible Officer:

    Thomas McMenamin, Executive Officer - Roads & Neighbourhood Services

  • Publication:

    This Technical Note will be published on the Council’s website following circulation to Members. Its contents may be disclosed or shared outwith the Council.

Details

  • The report is intended to provide an update to Elected Members on the provisional Roads Carriageway & Footway Resurfacing Programme for 2026/2027, 2027/2028 and 2028/2029.
  • The list will be finalised, and an Annual Programme confirmed for 2026/27 in later in April 2026 based on the capital budget allocated for the financial year.
  • The remaining locations will be monitored in the interim period with an annual programme confirmed for 2027/2028 and 2028/2029 at the start of each respective financial year once capital budgets have been confirmed for the year.
  • It is necessary that whatever funds are available are spent on the correct schemes at the right time and that schemes are prioritised using optimisation methodologies to maximise risk reduction and minimise whole life costs.
  • The methods that East Dunbartonshire Council use to optimise our programme have been developed from best practice methods found in “Well-Managed Highway Infrastructure – A Code of Practice”.
  • The "Well-managed Highway Infrastructure - A Code of Practice" provides guidelines for local highway authorities in the UK to adopt a risk-based approach to managing highway networks effectively and informs the East Dunbartonshire Council Road Inspection and Maintenance Plan 2024 to 2027.
  • The carriageway and footway element of the capital programme is based on a scheme of prioritisation which uses condition assessment scores, prioritisation criteria and weightings to determine which projects should be prioritised for investment.
  • The condition of East Dunbartonshire Council roads is assessed annually as part of the Scottish Roads Maintenance Condition Survey (SRMCS), an independent survey of road conditions in all 32 Scottish local authorities. The survey provides each local authority with a Road Condition Index (RCI) which identifies the percentage of roads in need of maintenance.
  • The figures below represent the carriageway condition survey conducted by East Dunbartonshire Council, utilising the Red-Amber-Green rating system. This survey is produced by WDM on behalf of Scottish local councils, providing an objective assessment of road surface conditions to guide maintenance priorities and infrastructure planning. For context, a comparison between the reports for 2023–2025 and 2024–2026 is included to highlight any changes or trends in road conditions over time.

RED AMBER GREEN 2023 2025 Red >=100 (6.62%) 24.292km. Amber 180 and <100 (5.71% ) 20 923 km Amber 2>-40 and <80 (21.98%) 80.597km Green >=0 and <40 (65.69%) 240.869km RED AMBER GREEN 2024 2026 Red >=100 (6.20%) 22.632km Amber 1>=80 and <100 (5.69%) 20.753km. Amber 2>=40 and <80 (20.04%) 73.137km Green >=0 and <40 (68.07%) 248.410km.

Click to enlarge.

  • The current East Dunbartonshire Council Road Condition Index is 33% which is down from the previous RCI of 35.1%. This is a encouraging step and the Service will look to continue this positive direction.
  • A visual inspection by road officers is source of accuracy on the condition of the network, in greater detail.
  • In addition, the Service will utilise Gaist Surveys (Unrivalled roadscape intelligence - Gaist). This full network survey allows the Roads Network Operations team a snapshot of reliable carriageway condition data that will empower the team and officers to make the best investment decisions based on accurate data.
  • The Team also investigates carriageway and footway maintenance issues to target improvements. The team analyse condition data available for each asset to identify need for maintenance and/or improvement.
    • Network Hierarchy – the team ensure that greater priority is given to roads and key assets on roads that have the greatest usage or need.
    • Risk – the team will give a higher priority to schemes that pose a risk to public safety.
    • Value for Money – the team will use the right treatments at the right time in order to produce cost effective solutions.
  • The Roads Network Operations Management – the team endeavour to ensure works are programmed to minimise disruption to users and maximise benefits to the community by combining schemes for different assets together where possible. For example, programme traffic sensitive roads during school holidays, if possible, etc.
  • Each asset has its own set of prioritisation criteria and weighting sets based on the principles above which consider the unique attributes and requirements of each asset.
  • It is the aim of the Roads Network Operations teams to deliver all of the schemes listed in this report over a three-year period. However, this may not be possible due to unforeseen or emergency works causing potential conflict on the network. This is why there needs to be an element of flexibility in the programme to allow officers to react to any changes that may arise.
  • If a location is not delivered due to a conflict it will remain on the overall programme and will be re-prioritised for delivery in a future financial year or will be on hold until deploy a suitable contractor i.e., locations contaminate with coal tar.
  • The capital work programme will be reviewed regularly to ensure that any adjustment is made to the programme as soon as possible with these reflecting in the annual/quarterly updates issued to elected members in April, July, October, and January each year.
  • The provisional programme of 2026/27 is laid out for your information. The programme is based on the capital allocation for the current year which was used as a guide to allow for preparations to be made prior to any budget decisions being taken by Council.
  • Footway and Carriageways are a maturing asset and in constant use o the condition will change over time and it is important that there is recognition that the resurfacing programmes are provisionally only at this time. These will be subject to change depending on the outcome of the annual or ad-hoc/reactive condition assessment review process, result of coal tar, conflict with utility works, weather permit, and any other unforeseen circumstances.
  • The investment in the East Dunbartonshire Council carriageways and footways improves the accessibility and safety of the road and footway network and therefore has a positive impact for all users, particularly older people, and those with a disability.

2026/27 Carriageway Programme (with no programmed dates)

2026/27 Carriageway Programme (with no programmed dates)
Location Town Comments

Ballater Drive

Bearsden

Between Braemar and Coronation Way

Stockiemuir Road (phase 5)

Bearsden

From Craighead drive toward Craigton Roundabout

Campsie Road (Near traffic lights and Urban sections)    

Lennoxtown

Junction goes to golf club -200 m toward Torrance

Kilsyth Road (phase 3)    

Kirkintilloch

Cala Home to council depot (postponed due to clash with SGN works)

Kirkintilloch Road (phase3)    

Bishopbriggs

Between Cadder Roundabout & Westerhill Road

Milton Road    

Kirkintilloch

From Glasgow Road to Bridge

Craigmaddie Road    

Balmore

A81 to 400m before Tower Road

Chryston Road    

Kirkintilloch

Rail bridge to Ruther Ave-overlay

Lenzie Road    

Kirkintilloch

Laurel Ave to Myrtle Ave

Strathblane Road (Phase 2)    

Milngavie

100m north of Marchfield to Scottish Water access

Milngavie Road (phase 4)    

Bearsden

Manse Road to Mosshead

Milngavie Road (phase 5)    

Bearsden

Manse Road to Mosshead

Bellfield Road & Washington Road    

Kirkintilloch

School to Glasgow Road

Lindsaybeg Road (phase 1)    

Lenzie

Auchinloch to Easter Gaingaber Roundabout -Anti Skids

Lindsaybeg Road (phase 2)    

Lenzie

Easter Gaingaber to roundabout

Waterside Road    

Kirkintilloch

Market to Merkland

Waterside Road    

Kirkintilloch

Outside Gartconner Primary School

Park Road    

Bishopbriggs

Hillside Dr to no. 143 (outside School)

Watermill Ave (phase 1)    

Lenzie

Full

Watermill Ave (phase 2) & Farm Park plus Millas Plc 

Lenzie

Full

Woodiliee Road    

Kirkintilloch

Full

Initiative road    

Kirkintilloch

All the legs to and from Lindsaybeg Roundabout

New Lairdsland Road    

Kirkintilloch

From Canal to Catherine St

Burnbrae Road (phase 2)    

Kirkintilloch

Bridge deck to Muckcroft Road

Benvue Road    

Lennextown

Full

Orchard Field    

Lenzie

Full

Waverley Crescent    

Kirkintilloch

Full

Tower Road/Back O' Hill Road    

Torrance

Full Length Back O Hill Road

Redmoss Road    

MOC

TBC

Glenwood Road    

Lenzie

Full

Ballaig Avenue    

Bearsden

Full

Marmion Drive    

Kirkintilloch

Full

Hilton Road    

Milngavie

Full

Burnside Avenue    

Kirkintilloch

Full

John Street    

Kirkintilloch

Full

St Columba Drive    

Kirkintilloch

Full

Millburn Street    

Lennextown

Full

Moncrieff Avenue    

Lenzie

Full

Lock Road    

Kirkintilloch

Woodilee to Kirksyde Avenue

Willow Avenue and Cedar    

Lenzie

Full

Kirk St    

Milngavie

Full

Badenoch Road, Loran Place, Badenoch Road    

Kirkintilloch

Full

Finlay Rise, including Auchencruive    

Milngavie

Auchenhowie Road to Auchencruive

2026/27 Footway Programme (with no programmed dates)

2026/27 Footway Programme (with no programmed dates)
Location Town Comments

Milngavie Road (phase 3)    

Bearsden

One side Kessington Hall side Opposite Asda

Kirkintilloch Road    

Bishopbriggs

Meadow Burn to opposite Westerhill Road - one side

Inveroran Drive (phase 2)    

Bearsden

Glendaruel Ave to Durness Ave - both sides

Gallowhill Road (Phase 1)    

Lenzie

Beech to Moss

Elm Ave    

Lenzie

Beech Road to Number 6

Roman Road

Bearsden

From School to Grange Road/Rail Bridge

South Main Road    

Milngavie

Full Length - both sides

Gallowhill Road (Phase 2)    

Kirkintilloch

Kirkintilloch Road to Beech - both sides

Park Crescent    

Torrance

Full Length

Thorn Road    

Bearsden

Thorn Drive to Golf club

Main st    

Torrance

Kelvin Bridge RB to Campsie Rd

2027/28 Carriageway Programme (with no programmed dates)

2027/28 Carriageway Programme (with no programmed dates)
Location Town Comments

Southmain Road

Milngavie

Full length

Glenorchard    

Balmore

Golf Club Rd to Woodend house

Baldernock Linn    

Balmore

Overlay

Acre Valley Road    

Torrance

Overlay

Campsie Drive (phase 2)

Milngavie

Phase 2 (between No 51 and junction of Bleurs St)- Phase 1 done 2024

Allander Road Phase 2

Milngavie

Numbers 42 - 74

West Balgrochan Road

Torrance

Maitland Drive to Acre Valley Road

Westercledden Road

Bishopbriggs

Laggan Rd to Woodhill Rd

Angus Ave

Bishopbriggs

Torr Rd to Westercledden Rd

Stockiemuir Road (phase 6)

Bearsden

TBC

Thorn Road    

Bearsden

Between Bearsden cross and Thorn Drive

Waterside Road from Oxgang roundabout to Merkland

Kirkintilloch

From Oxgang roundabout to Merkland - 600sqm Anti-skid required

Park Road

Bishopbriggs

Kirkintilloch Rd to Hillside

Park Road

Bishopbriggs

Hillside to End of Cul de sac

Kirkintilloch Road

Lenzie

Beech Road to cross

Clober Road

Milngavie

Between B8050 and N. Claremont Ln. Junction included

B8050 Craigdhu Road    

Milngavie

From Clober Road to Ferguson Avenue

Lee Crescent

Bishopbriggs

From Emerson Road to Crowhill Road

Woodfield Avenue    

Bishopbriggs

From Callieburn Road to Rose Dale

Wellington Road

Bishopbriggs

At Low Moss industrial estate

A81 Glasgow Road (phase 1)

Milngavie

From Station Road to Auchenhowie Road

Gary Avenue

Bearsden

Full - Possible coal tar- Overlay

Stockiemuir Ave

Bearsden

School to Mosshead Park

Menteith Avenue    

Bishopbriggs

From Hazel Dene to the pedestrian crossing at Etive Park/shiel

Springfield rd Bishopbriggs

Bishopbriggs

From Callieburn to Hazel

Ballaig Avenue

Bearsden

Full

Buccleuch Drive + Brandon Drive

Bearsden

Full

Queensberry Avenue

Bearsden

Full

Kirkton Crescent

MOC

Full

Meikle Bin Brae

Lennoxtown

Full

Redhill View, Argyl Gardens, Bluebell Way, Warrer Wall

Lennoxtown

Full

Eastermains & Drumhill

Kirkintilloch

Full

Blacklands Place

Lenzie

Bridge To Lindsaybegg Rd

Craigie Road, Foxes Grove, Meadowburn Ave

Lenzie

Full

Cleish Avenue

Bearsden

Full

Limetree Walk, Walnut, Cherry Place, Briar Bank, Larch Grove
(phase 2)

Kirkintilloch

Full

Craigmarloch Ave

Torrance

Full - postponed in 2024 so needed for re-programme

Cromarty Ave

Bishopbriggs

Full - include junction with Solway Rd

Northbank road

Kirkintilloch

TBC

Millersneuk

Lenzie

TBC

Westergreens Ave - part 1

Lenzie

TBC

Westergreens Ave - part 2

Lenzie

TBC

Kelvin view

Twechar

Full

Gartshore Cres

Twechar

Kelvin view to Johnstone terrace

2027/28 Footway Programme (with no programmed dates)

2027/28 Footway Programme (with no programmed dates)
Location Town Comments

Springfield Road

Bishopbriggs

From Callieburn Road to Muir Street

Garngaber Ave

Lenzie

TBC

Garngaber Ave

Milngavie

TBC

South Mains Road

Milngavie

TBC

Kessington Road

Bearsden

Rannoch To Inveroran

Roman Drive (Both Footways) from Roman Rd to Milngavie Rd

Bearsden

From Roman Rd to Milngavie Rd

Menteith Avenue

Bishopbriggs

Woodhill Road to Hazel Dene, (both sides)

Glasgow Road

Milngavie

From Railway Bridge to Waitrose

Station Road

Milngavie

LH Footway from Glasgow Rd to Fulton Rd

Strathblane Road

Milngavie

From Baldernock Rd to Opposite Moor Rd

Killermonth Road    

Bearsden

Speirs to Kessington - Missed from 2023

Prestonfield

Milngavie

Internal path + two cul de sac

Gleenwood Garden

Lenzie

TBC

Allander Road

Milngavie

TBC

Douglas Muir Road

Milngavie

From Drumbeg Terrace to Castle Mains Road

West Chapelton Ave

Bearsden

One side only

2028/29 Carriageway Programme (with no programmed dates)

2028/29 Carriageway Programme (with no programmed dates)
Location Town Comments

Kerr St

Kirkintilloch

Bank to Oxford St

Birch View

Bearsden

Milngavie Rd to Train Station

Kilsyth Road - Phase 4

Kirkintilloch

Council depot to 200 meter after B023

Stockiemuir Road (phase 5)

Milngavie

TBC

High St

Kirkintilloch

A806 Kirkintilloch Bypass to Hillhead RB

Peel Glen Road

Bearsden

Duntocher to GCC boundary

Balmore Road

Milngavie

100 metres from Allander RB toward new houses

Kirkintilloch Road

Bishopbriggs

From Park Road to South Crosshill Rd

Craighead Rd

MOC

Between Campsie Road and private road

Woodburn Avenue

Milngavie

Between Kwik fit (Full junction including) to ped crossing at Station and junction with Park Road

Roman Road

Bearsden

From School to Roman Drive

Bankhead Rd

Kirkintilloch

Luggie Rd to 20mts past Back to Dykes Rd

Duntocher Road

Bearsden

Ledi Drive junction to 100 meter after Antonine Rd

Glasgow Road

Milngavie

From Station Rd to Auchenhowie Rd

Balmuildy Road   

Bishopbriggs

Stirling Drive to Hilton Depo and Buchley Eco Centre to Mavis Valley

Falloch Road

Milngavie

Between Hunter Road and Achray Place

Gartconnell Drive

Bearsden

Full - Drymen Rod to Gartconell Rd

Conon Ave

Bearsden

Full

The Loan

Milngavie

Full overlay

Eastside

Kirkintilloch

Hillhead Roundabout (RB to be included) to Kilsyth Rd

Cleish Avenue

Bearsden

Full

Cairnview

Kirkintilloch

Bach O dykes to Bankhead

Westergreens Ave

Lenzie

From JCT of Gallowhill Rd to NO 27

Cypress court

Lenzie

Full

Ettrick Drive

Bearsden

Full

Lawer Garden

Bearsden

Full

Dunn Park

Kirkintilloch

Full

Regent Square

Lenzie

Full

Kelvin View

Twechar

Full

Greenhill

Bishopbriggs

Full

Oxgang Roundabout

Kirkintilloch

Oxgang Roundabout and all legs

Kersland Drive

Milngavie

Full

South Glassford Street

Milngavie

Full

Muirlees Crescent

Milngavie

Full

Benvue Road

Lennextown

 Junction with Rowantree Place to Westerton

Lindsaybeg Road

Lenzie

Junction with Burnbrae Road - include Anti Skids

2028/29 Footway Programme (with no programmed dates)

2028/29 Footway Programme (with no programmed dates)
Location Town Comments

Milngavie Road

Milngavie

Glasgow Rd to Kwik fit

Kessington Road

Bearsden

Rannoch To Inveroran

Boaghead Rd

Kirkintilloch

TBC

Grampian Way (phase 2)

Bearsden

TBC

Calder Gate & Hilton Park

Bishopbriggs

TBC

Park Ave

Milngavie

Main section only - one side

Maxwell Ave

Bearsden

TBC

Allander Garden

Bishopbriggs

TBC

Kelvin Road

Milngavie

TBC

Craigdhu Rd

Milngavie

From Hunter RB to Clober Road - both sides