Technical Notes 2026, Issue 176 - Proposed Response to the Scottish Planning Biodiversity Metric Consultation
The purpose of this Technical Note is to update Members on the publication of the ‘Scottish Planning Biodiversity Metric’ (SPBM), preparation of a Council response to the draft SPBM and to provide Members an opportunity to comment on the draft response. View the SPBM consultation webpage.
- National Planning Framework 4 (NPF4) was published by the Scottish Government on 13 February 2023. For the purposes of determining planning applications, NPF4 forms part of the statutory development plan alongside the East Dunbartonshire Local Development Plan 2 (adopted in November 2022). Policy 3 of NPF4 seeks ‘to protect biodiversity, reverse biodiversity loss, deliver positive effects from development and strengthen nature networks’
- NatureScot has recently published a draft ‘Scottish Planning Biodiversity Metric’ (SPBM) which is intended specifically to the support the implementation of NPF4 Policy 3(b) which applies to all developments categorised by the hierarchy of development as National or Major Development, or Local Development that requires Environmental Impact Assessment (EIA). Policy 3(b) requires all applicable development to not only mitigate against impacts upon biodiversity, but also to provide significant biodiversity enhancements as part of the proposal. Unlike the Biodiversity Net Gain (BNG) system in England, NPF4 does not set out a definition or quantitative standard for biodiversity enhancement. However, Policy 3(b) states that ‘best practice assessment methods should be used’ to inform the decision. The draft SPBM has been brought forward as a best practice assessment method, in accordance with the terminology used in Policy 3(b). Nature Scot has previously produced guidance on the use of existing biodiversity metrics in the Scottish planning system, with these other methods continuing to be available to applicants and decision-makers in addition to the SPBM
- It should be stressed, again in contrast to the BNG system used in England, that use of the SPBM is not statutory and the significant enhancements in biodiversity as required by NPF4 Policy 3(b) can be argued through both quantitative and qualitative means
- Despite the differences in status, the English BNG metric has formed the starting point for devising the SPBM, taking into account learning from the implementation of BNG in England, and adapting the tool to meet Scotland’s habitat and planning context
- The purpose of the metric is to provide the option of a quantitative approach to measuring how a proposed development will change a site’s biodiversity value. It assesses existing habitats against those that will remain, be enhanced or new habitats that will be created, and calculating biodiversity units to demonstrate firstly, whether the proposal will fully offset the impacts of the development on the existing habitat, and secondly whether it will deliver biodiversity enhancement above the baseline (before development). The calculation in the tool is intended to support the assessment of relevant applications against Policy(3b) but does not replace the need for specialist input into the process from relevant consultees
- The SPBM is comprised of the following elements:
- Scottish Planning Biodiversity Metric – Habitat Condition Assessment (Excel workbook)
- Scottish Planning Biodiversity Metric – Calculation Tool (Excel workbook)
- Scottish Planning Biodiversity Metric – User Guide (PDF document)
- The initial version of the metric is currently subject to stakeholder consultation until 30 November 2026, with the first main release of the metric for practical use expected in Spring 2027
- A draft Council response to the SPBM is provided as Appendix 1 to this Technical Note. The response largely supports the draft SPBM, with the Council’s answers to the multiple-choice questions in the consultation survey being as follows:
- Strongly Agree = 1
- Agree = 34
- Unsure = 3
- Disagree = 1
- Strongly Disagree = 2
- Where the draft Council response has answered unsure, disagree or strongly disagree, a reason explaining our answer has been provided. These answers generally relate to the following matters:
- the focus in the tool on measuring habitat as a proxy for measuring biodiversity itself, and the appropriateness of this approach for urban/ suburban areas such as East Dunbartonshire,
- practical implementation of the metric; and
- the approach to the categorisation of trees
- Should Members wish to make any comments that can be incorporated into the draft response, or have any questions, please contact: Development.Plan@eastdunbarton.gov.uk and Stewart.McNally@eastdunbarton.gov.uk. Please provide any comments by 12pm on Friday 27 November 2026
- As set out above, the Scottish Government and Nature Scot’s intention is for the SPBM tool to be used for National and Major development, and Local Development that requires Environmental Impact Assessment (EIA), where the requirement of NPF4 Policy 3(b) is for significant biodiversity enhancements to be provided. Policy 3(c) which applies instead to Local Development (excluding where EIA is required), also requires development to enhance biodiversity however there is no requirement for this enhancement to be ‘significant’. In the case of determining Local Development, it is intended by the Scottish Government that the decision-making process should give weight to the Developing with Nature Guidance, also produced by Nature Scotland, and local guidance such as the Natural Environment Planning Guidance and Green Infrastructure and Green Network Supplementary Planning Guidance. Applicants for Local Development would however be able to utilise the SPBM in their proposals should they wish, and the calculation of biodiversity units within the tool would support measuring whether or not the development ensures that there is no adverse impact upon biodiversity.
- Members should also note that a draft Urban Greening Factor (UGF) for East Dunbartonshire has been prepared by the Council and was approved at Place Neighbourhood and Corporate Assets Committee on 05 November 2026 (view Report PNCA/038/26/SG). The Urban Greening Factor is much broader in its purpose and supports increased multifunctional ‘greening’ within new development. Whilst the UGF and SPBM are complimentary tools, they perform different functions with the UGF helping users to meet multiple policy requirements within NPF4.